Planned inspections
Accessible distribution boards, cable sections and electrical accessories. Damage, signs of overheating, lighting condition and identification labels. Operations follow the site’s established work authorisation procedures.
ENGINEERING DISCIPLINES / TASHKENT
A commercial building’s internal electrical systems: distribution, lighting and power supplies to building services equipment. With agreed responsibility boundaries and work authorisation procedures.

01 / Scope of work
The activities below may form part of the programme. Specific tasks, intervals and materials are recorded in the agreement.
Accessible distribution boards, cable sections and electrical accessories. Damage, signs of overheating, lighting condition and identification labels. Operations follow the site’s established work authorisation procedures.
Investigation of loss of power and unstable circuit operation. Repeated protective device trips are assessed without bypassing their functions. Identification of any need for specialist measurements.
Agreed replacement of luminaires, switches, sockets and other components. Work on connections and accessible circuit sections. Checks before returning the section to service.
Responsible personnel, documentation and work authorisation requirements. Shutdown windows and equipment sensitive to power interruptions. Reporting linked to the component or zone serviced.
02 / Working process
Equipment, documentation, operating hours and access. A separate initial survey where necessary.
Tasks, intervals, materials, shutdowns and responsibility boundaries.
Completed tasks, technical observations and next actions are reported to the person responsible for the facility.
A record of completed work, sections serviced and identified issues. Repair priorities and tasks requiring a separate programme or specialist contractor.
Necessary shutdowns are agreed according to the operations involved. Electrical testing laboratory services, specialist test reports, upgrades and repairs are not included by default in the standard estimate.
03 / Practical questions
Work arrangements are coordinated with the site’s operating requirements. If a shutdown is needed, its timing and the affected equipment are agreed in advance. Each operation is assessed with regard to safety and work authorisation.
No, not automatically. Where tests or specialist reports are needed, their scope, feasibility and provider are determined separately.
Yes, within agreed boundaries. During diagnostics, we distinguish between faults in the supply circuit and faults in the unit itself to establish the repair scope and responsibilities.
ESTIMATE
If the system condition and scope are not yet clear, start with a survey. A basic audit, extended diagnostics and regular maintenance are separate programmes.
The calculator provides an estimate, not a fixed offer. Contract minimums and individual assessment requirements still apply.
Tashkent, Uzbekistan
Equipment, documentation, operating hours and access. A separate initial survey where necessary.